      • Corporate Manslaughter cases
      • Recent Prosecutions
      • HSE Alerts
      • News Articles
      • Guidance
    • FAQs
    • Shop
  • About us
    • Who is CQMS
    • Accreditation, Certification & Memberships
    • Testimonials
    • Privacy Notice
  • Get in Touch
0

£0.00

✕

Company fined after worker paralysed by fall at Watford Football Stadium

11th October 2021

A company has been fined after a worker was paralysed after falling 11 metres down a stairwell at a football stadium when the concrete floor he was working on collapsed.

Peterborough Magistrates’ Court heard that on 14 June 2016, workers were constructing a new hospitality and seating stand at the stadium of Watford Football Club. The concrete floor and associated formwork collapsed causing a number of workers to fall. Most of the workers were able to cling to the structure to escape serious injury. However, Ashley Grealish fell approximately 11 metres down the mouth of a stairwell to the basement below sustaining multiple injuries including spinal damage, which caused permanent paralysis from the waist down.

An investigation by Health & Safety Executive (HSE) found that the company’s temporary works management system was lacking. The contractor should have had a suitable design for the temporary works, which are part of a construction project needed to enable the permanent structure to be built, taking proper account of the vertical load and the need for horizontal stability. There should also have been a robust system to check the temporary works were properly installed and thoroughly assessed before starting to load it with the wet concrete to form the floor slab.

ECS Groundwork Ltd of Warren Farm, Colney Heath, St Albans pleaded guilty to breaching Regulations 19 (1), 19(2) and 19(3) of the Construction (Design and Management) Regulations 2015. The company was fined £40,000 and ordered to pay costs of £14,505.

Speaking after the hearing, HSE inspector Rauf Ahmed said: “The injuries suffered by Mr Grealish are life changing and the incident could easily have been fatal. This serious incident and devastation could have been avoided if the company had planned a safe system of work to prevent the support system used to cast the concrete floor from collapsing.”

Watford Stadium Collapse

Watford Stadium Collapse

Source HSE Website 30/09/2021

For more HSE news including prosecutions visit the HSE website

Share

Related posts

29th March 2024

Director jailed for failing to protect workers from asbestos exposure


Read more
29th March 2024

Tobacco firm fined £32,000 following machinery failures


Read more
28th March 2024

Company fined after worker crushed to death


Read more

Get in touch

CQMS Limited
The Clock, 12-13 Westgate, Grantham, Lincolnshire, NG31 6LT
Tel: 01476 566 665
Email: enquiries@cqms-ltd.com

Connect with us on social media

CQMS Safety-Scheme is a UKAS-accredited Type C Inspection Body under ISO 17020:2012 for the provision of health and safety assessment services’
CQMS Safety-Scheme - UKAS-accredited Type C Inspection Body under ISO 17020:2012

Search our site

✕

External Links

H&S Executive Website
Incident Contact Centre
The British Safety Council
RoSPA

© 2017 - 2025 CQMS Limited | Registered office address: Nationworld House, Noose Lane, Willenhall, England, WV13 3AP Company number: 02950076 | All rights reserved | Site built and hosted by GIGER MEDIA | Content managed by CQMS
    0

    £0.00

      ✕

      Login

      Lost your password?