cqms-header-logocqms-header-logocqms-header-logocqms-header-logo
  • Welcome
  • Consultancy Services
    • Competent Person Service
    • Health and Safety Documentation
    • Audits & Inspections
    • CDM Consultancy
  • Safety Scheme Services
    • Safety Scheme Assessment & Certification
    • Supply Chain Management
    • Safety Scheme Portal
    • Safety Scheme Fees
    • Apply Now
  • Training
    • Health and Safety Training Courses
    • Online training courses
    • IOSH Managing Safely
  • Resources
    • Insights
      • Corporate Manslaughter cases
      • Recent Prosecutions
      • HSE Alerts
      • News Articles
      • Guidance
    • FAQs
    • Shop
  • About us
    • Who is CQMS
    • Accreditation, Certification & Memberships
    • Testimonials
    • Privacy Notice
  • Get in Touch
0

£0.00

✕

Architects fined for safety failings in care home construction

27th November 2014

Architects fined for safety failings in care home construction

A firm of architects has been fined for safety failings in the construction of a new timber frame care home in Hemlington.

Teesside Magistrates’ Court today (26 November) heard that Mario Minchella Ltd had not given contractors relevant information about the flammability of the timber frame used in the construction of the new building in October 2012.

A routine inspection of the work by a Health and Safety Executive (HSE) inspector found that the separation distance between the new timber frame building under construction and an adjacent occupied care home was insufficient.

As a result, had the timber frame caught fire there was a serious risk that the radiant heat would cause the fire to spread to the care home, putting the lives of residents and staff inside at risk.

HSE found that there was nothing in the design specification produced by Mario Minchella Ltd to alert construction workers erecting the timber frame to the additional fire risk it created, and the need to take action accordingly.

The court was told that it would have been reasonable for Mario Minchella Ltd to have specified in its design that fire-resistant timber be used or that it considered the sequence of construction so that the timber frame of each floor was clad before the next one was constructed, reducing the amount of timber exposed at any one time.

Mario Minchella Ltd, of Swallow House, Parsons Road, Washington, Tyne and Wear, was fined a total of £1,500 after pleading guilty to two breaches of the Construction (Design and Management) Regulations 2007. The company was also ordered to pay £816 costs.

 

 

Share

Related posts

29th March 2024

Director jailed for failing to protect workers from asbestos exposure


Read more
29th March 2024

Tobacco firm fined £32,000 following machinery failures


Read more
28th March 2024

Company fined after worker crushed to death


Read more

Latest News

  • Construction Risk Assessment: How to Get it Right in the High-Risk World of Construction20th January 2025
  • A Guide to Health and Safety in the Construction Industry20th January 2025
  • 8 Common Health and Safety Risks in the Workplace5th September 2024
  • Best Practices for Health and Safety Audit Preparation5th September 2024
  • 5 Steps to Risk Assessment5th September 2024

Filter by Category

  • Corporate Manslaughter (22)
  • Guidance (27)
  • HSE Alerts (33)
  • News Articles (62)
  • Recent Prosecutions (747)

Get in touch

CQMS Limited
The Clock, 12-13 Westgate, Grantham, Lincolnshire, NG31 6LT
Tel: 01476 566 665
Email: enquiries@cqms-ltd.com

Connect with us on social media

CQMS Safety-Scheme is a UKAS-accredited Type C Inspection Body under ISO 17020:2012 for the provision of health and safety assessment services’
CQMS Safety-Scheme - UKAS-accredited Type C Inspection Body under ISO 17020:2012

Search our site

✕

External Links

H&S Executive Website
Incident Contact Centre
The British Safety Council
RoSPA

© 2017 - 2025 CQMS Limited | Registered office address: Nationworld House, Noose Lane, Willenhall, England, WV13 3AP Company number: 02950076 | All rights reserved | Site built and hosted by GIGER MEDIA | Content managed by CQMS
    0

    £0.00

      ✕

      Login

      Lost your password?