cqms-header-logocqms-header-logocqms-header-logocqms-header-logo
  • Welcome
  • Consultancy Services
    • Competent Person Service
    • Health and Safety Documentation
    • Audits & Inspections
    • CDM Consultancy
  • Safety Scheme Services
    • Safety Scheme Assessment & Certification
    • Supply Chain Management
    • Safety Scheme Portal
    • Safety Scheme Fees
    • Apply Now
  • Training
    • Health and Safety Training Courses
    • Online training courses
    • IOSH Managing Safely
  • Resources
    • Insights
      • Corporate Manslaughter cases
      • Recent Prosecutions
      • HSE Alerts
      • News Articles
      • Guidance
    • FAQs
    • Shop
  • About us
    • Who is CQMS
    • Accreditation, Certification & Memberships
    • Testimonials
    • Privacy Notice
  • Get in Touch
0

£0.00

✕

Manufacturing company fined after worker suffered multiple electrical burns

28th June 2021

Glassflake Ltd has been sentenced after an employee received an electric shock while working inside a transformer cabinet.

Leeds Magistrates’ Court heard that, on the 7 June 2019, the worker was changing tappings on a transformer, which serves the tanks which melt glass, at a factory on Forster Street, Leeds.

An investigation by the Health and Safety Executive (HSE) found that he was working on the transformer supplying current to an electric heating element. He was found unconscious inside the rear of the transformer, with the transformer not isolated. His torch and spanner were on the floor of the cabinet, and he had significant burns to his chin and the back of his head consistent with an electric shock passing from his chin to the side of the cabinet.

Glassflake Ltd of Forster Street, Leeds, West Yorkshire pleaded guilty to breaching Regulation 3 (1) (a) of the Electricity at Work Regulations 1989. The company has been fined £30,000 and ordered to pay £693.62 in costs.

After the hearing, HSE inspector Julian Franklin commented: “Working on live electrical systems exposes workers to significant risk of electric shock and should be avoided if reasonably practical”.

“This incident could so easily have been avoided by simply carrying out the correct control measures, primarily by isolating the power supply first.

“HSE will not hesitate to take appropriate enforcement action against those responsible for electrical work that put their workers at risk.”

Source HSE Website 10/06/2021

For more HSE news including prosecutions visit the HSE website

Share

Related posts

29th March 2024

Director jailed for failing to protect workers from asbestos exposure


Read more
29th March 2024

Tobacco firm fined £32,000 following machinery failures


Read more
28th March 2024

Company fined after worker crushed to death


Read more

Get in touch

CQMS Limited
The Clock, 12-13 Westgate, Grantham, Lincolnshire, NG31 6LT
Tel: 01476 566 665
Email: enquiries@cqms-ltd.com

Connect with us on social media

CQMS Safety-Scheme is a UKAS-accredited Type C Inspection Body under ISO 17020:2012 for the provision of health and safety assessment services’
CQMS Safety-Scheme - UKAS-accredited Type C Inspection Body under ISO 17020:2012

Search our site

✕

External Links

H&S Executive Website
Incident Contact Centre
The British Safety Council
RoSPA

© 2017 - 2025 CQMS Limited | Registered office address: Nationworld House, Noose Lane, Willenhall, England, WV13 3AP Company number: 02950076 | All rights reserved | Site built and hosted by GIGER MEDIA | Content managed by CQMS
    0

    £0.00

      ✕

      Login

      Lost your password?